Logistics · West Midlands, UK
1.2 MWp rooftop solar for a Midlands distribution centre
A national 3PL operator wanted to cut Scope 2 emissions across a 40,000 m² distribution centre without touching capex.

1.14 GWh
Annual generation
£182k
Cost saving p.a.
236 t
CO₂e avoided p.a.
£0
Upfront capital
The challenge
Rising energy tariffs and mounting customer pressure on Scope 3 reporting, with no capital budget available in the current cycle.
Our approach
- Free desktop energy assessment and building performance review
- Building Atlas model of the roof geometry, shading and structural constraints
- Funded delivery via our nationally recognised framework — no debt, no capex
- 25-year O&M included, with performance guaranteed
The outcome
- 1.2 MWp rooftop solar commissioned in 14 weeks
- 40% on-site consumption offset, protecting against tariff volatility
- Board-level Scope 2 story evidenced with live metering
“iEM360 removed every objection: no capital, no risk, and a delivery team that just got on with it.”