Logistics · West Midlands, UK

1.2 MWp rooftop solar for a Midlands distribution centre

A national 3PL operator wanted to cut Scope 2 emissions across a 40,000 m² distribution centre without touching capex.

1.2 MWp rooftop solar for a Midlands distribution centre
1.14 GWh
Annual generation
£182k
Cost saving p.a.
236 t
CO₂e avoided p.a.
£0
Upfront capital

The challenge

Rising energy tariffs and mounting customer pressure on Scope 3 reporting, with no capital budget available in the current cycle.

Our approach

  • Free desktop energy assessment and building performance review
  • Building Atlas model of the roof geometry, shading and structural constraints
  • Funded delivery via our nationally recognised framework — no debt, no capex
  • 25-year O&M included, with performance guaranteed

The outcome

  • 1.2 MWp rooftop solar commissioned in 14 weeks
  • 40% on-site consumption offset, protecting against tariff volatility
  • Board-level Scope 2 story evidenced with live metering
iEM360 removed every objection: no capital, no risk, and a delivery team that just got on with it.
Head of Property, national logistics operator