Projectsthatproceeded.
Funded delivery, off-balance-sheet — the projects below happened because capital was no longer the blocker.
- Projects
- Live UK sites
- Capex required
- £0
- Savings
- Insurance-backed
- Verification
- Building Atlas

Logistics · West Midlands, UK
1.2 MWp rooftop solar for a Midlands distribution centre
A national 3PL operator wanted to cut Scope 2 emissions across a 40,000 m² distribution centre without touching capex.
1.14 GWh
Annual generation
£182k
Cost saving p.a.
236 t
CO₂e avoided p.a.
£0
Upfront capital
Read the case

Healthcare / Public sector · North West England
Multi-site LED and BMS retrofit for an NHS Trust
A three-hospital Trust needed lighting and controls upgrades to meet its 2030 decarbonisation target.
3
Sites delivered
34%
Energy reduction
£410k
Cost saving p.a.
£0
Upfront capital
Read the case

Manufacturing · Yorkshire, UK
HVAC optimisation and metering for a food manufacturer
A tier-1 food producer needed granular energy visibility across production lines to hit customer sustainability KPIs.
180+
Metering points
22%
Base-load reduction
£265k
Cost saving p.a.
0 months
Payback (funded)
Read the case